97av,蜜桃视频下载,国产精品久久久久久婷婷,国产老妇伦国产熟女老妇久

     
  中文版 English
 
Hot news:
  Products
IEC Test Finger Probe
IPX1-IPX9K Waterproof Test Equipment
Electrical Appliance Testing Equipment
Environmental Test Chamber
Battery test equipment
Textile Test Equipment
Mechanical testing machine
Plug and socket testing equipment
test package
Laser Power Senser Measurement
Soil Sensor
Hot Product
IPX1 IPX2 Drip Waterproof Test...
UL1439 Sharp Edge Tester
BND-TPK05 IEC 60529 Test Probe...
IEC62368 test probe kit BND-TP...
IEC 61032 Standard Test Probe ...
IEC60320 EN60320 Appliances co...
UL 498 Standard Plugs and Rece...
IPX1 to IPX4 Drip rain test an...
Vertical horizontal vibration ...
IP5X IP6X Sand and dust proof ...
climate constant temperature a...
IPX1 to IPX9 waterproof testin...
 
 
Products
IEC61347 EN61347-1-Figure D.1 Annex D heating test enclosure heating test box
Name:IEC61347 EN61347-1-Figure D.1 Annex D heating test enclosure heating test box
Type:BND-WSX
Manufacturer:IEC61347 EN61347-1-Figure D.1 Annex D heating test enclosure heating test box,Temperature rise test
Product Description:

IEC61347 EN61347-1-Figure D.1 Annex D heating test enclosure heating test box


D.1 Test enclosure

The heating tests are made in an enclosure in which the temperature of the ambient air is

maintained as specified (see Figure D.1). The entire test enclosure shall be constructed of

heat resistant material 25 mm thick. The test compartment of this enclosure shall have

internal dimensions of 610 mm × 610 mm × 610 mm. The floor of the test compartment shall

measure 560 mm × 560 mm, permitting an air space of 25 mm all around the platform for

circulation of the heated air. A 75 mm heater compartment shall be provided below the floor of

the test area for the heating elements. One side of the test compartment may be removable,

but shall be so constructed that it can be securely fastened to the remainder of the enclosure.

One of the sides shall have a 150 mm square opening located centrally at the bottom edge of

the test compartment, and the enclosure so constructed that the only possibility of air

circulation will be through this opening. The opening shall be covered by an aluminium shield

as shown in Figure D.1.


D.2 Heating of enclosure

The heat source used for the test enclosure described above shall consist of four 300 W strip

heaters having approximate heating surface dimensions of 40 mm × 300 mm. These elements

shall be connected in parallel to the supply source. The elements shall be mounted in the

75 mm heater compartment midway between the test compartment floor and the base, and so

arranged that they form a square with the outside edge of each element 65 mm from the adjacent

inside wall of the enclosure. The elements shall be controlled by a suitable thermostat.


D.3 Lamp control gear operating conditions

During the test, the frequency of the supply circuit shall be the rated frequency of the lamp

controlgear, and the voltage of the supply circuit shall be the rated supply voltage of the lamp

controlgear. During the test, the temperature in the enclosure shall be maintained at 40(±5) °C;

prior to the test, the lamp controlgear (not energized) shall be placed in the chamber for a

sufficient interval of time to allow all parts to attain the temperature of the air therein. If the

temperature in the chamber at the end of the test differs from that at the beginning of the test,

this temperature differential shall be taken into account in determining the temperature rise of

the components of the lamp control gear. The lamp control gear shall supply the number and

size of lamps for which it is intended. Lamps shall be placed outside the enclosure.


D.4 Lamp control gear position in the enclosure

During the test, the lamp controlgear shall be in its normal operating position supported

75 mm above the floor of the test compartment by two 75 mm wooden blocks, and shall be

centrally located with respect to the sides of the enclosure. Electrical connections may be

brought out of the enclosure through the 150 mm square opening illustrated in Figure D.1.

During the test, the enclosure shall be so located that the shielded opening is not exposed to

draughts or rapid air currents.



D.5 Temperature measurements

The average ambient temperature in the enclosure is assumed to be the average air

temperature at positions not less than 76 mm from the nearest wall and on a level with the

centre of the lamp control gear.

The temperature is usually measured by a glass thermometer. An alternative sensor is a

thermocouple or 'thermistor' attached to a small metal vane shielded against radiation.

Temperatures on the case are usually measured by means of thermocouples. A temperature

is considered to be constant when three successive readings, taken at intervals of 10 % of the

previously elapsed duration of the test (but not less than 5 min intervals), indicate no change.


 
Home  |  Products  |  News  |  About us  |  Feedback  |  Contact us  |  
Copyright © 2008-2015 Hong Kong Bonad Technology Limited | Shenzhen Bonad Instrument Co., LTD. All Rights Reserved.
 
    Add:C505, Hongdu Building,Bao\\\'an45 district,Shenzhen,518101,Guangdong Province,China    Tel:+86-13380391156    Fax:0755-23721200    Email:Alice@szbonad.com
 
国产精品自在拍在线播放| 黄色综合网站| 中文字幕无码乱人伦在线| 国产精品国产三级国产av剧情 | 欧美 日韩 国产 亚洲 色| 江安县| 69亚洲精品久久久蜜桃小说| ass色迷迷的少妇pics| 国产美女永久免费无遮挡| 亚洲乱亚洲av国产av| 午夜诱惑| 成人在线亚洲| 内射美少妇| 日韩欧美在线一区二区| 午夜福利100| 在线亚洲欧美| 欧美专区第一页| 少妇做受高潮| 99精品人妻| 西西大胆人体视频| 久久精品不卡| 国产一区二区三区四区老人| 尤物在线观看| 久久精品国产亚洲av天美18 | wwwxxx| 陵水| 消息称老熟妇乱视频一区二区| 久久亚洲AV无码精品色午夜麻豆| 日韩视频 中文字幕 视频一区 | 91久久国产综合久久91精品网站| 尤物在线观看| 久久在线视频| 亚洲日韩国产二区无码| 国产一区二区三精品久久久无广告| 国产AV熟女一区二区三区| av大尺度一区二区三区| 暖暖在线视频日本| 女邻居丰满的奶水在线观看| 一本加勒比HEZYO无码人妻| 中文字幕91| 日韩熟妇视频|